Traffic inside Chenani-Nashri Tunnel suspended due to power shutdown

The traffic movement inside Chenani-Nashri Tunnel, also known as Dr Syama Prasad Mookerjee Tunnel was on Friday suspended due to a power shutdown, said officials. An official told a local news agency, Kashmir News Observer (KNO), that traffic will resume after power connectivity is restored inside the tunnel. He said the reason behind the power […]

The post Traffic inside Chenani-Nashri Tunnel suspended due to power shutdown appeared first on The Kashmir Walla.

Kashmir